Читать книгу Is a Ship Canal Practicable? онлайн
21 страница из 34
The Emperor was induced to intervene. M. Thouvener, the French Minister at Constantinople, was requested “to enlighten the mind of the Sublime Porte as to the views and wishes of France.”
The introduction of machinery now became a matter of necessity. Ten millions of dollars were expended for this object, and forty enormous dredges were soon at work upon the excavations. One of the novelties in the construction of these machines was a provision for carrying off the excavated material by means of a stream of water. One of the workmen, it is said, noticed that when removed in this way the slimy earth spread over a wide surface and became soon indurated, instead of flowing back into the place of excavation. It also possessed the further advantage of fixing the mobile sand.
The total amount of earth removed amounted to about four hundred million cubic yards. By working day and night, the machines of M. Borel and Lavelley were able to remove 78,056 to 108,000 cubic meters per month.
Although the completion of the canal now seemed assured, the opposition of the English Government continued up to the last moment. Every effort was made to prejudice the Sultan and the Khédivé against the work, and, by exciting the jealousy of the Sultan, to induce him to arrest the excavations.