Читать книгу Trench Warfare: A Manual for Officers and Men онлайн
12 страница из 27
There are certain obvious requirements that have to become rules. When required to fill sandbags, always look for the nearest excavation being made and fill from there, if distance permits.
As a matter of fact, in every trench there is a continuous revetting, widening of communications or control trenches, or driving of a tunnel to a listening post.
A—Parapet Traverse
B—Parados Traverse
TRAVERSED & RECESSED TRENCH.
Inasmuch as the time for filling sandbags is never ending, if work is being done and the earth is not absolutely needed for parapet or parados, the earth, if dry, should be put in sandbags, and, if necessary, stored until it is needed. The repair work that is most necessary takes precedent and is about as follows: Any damage to parados or traverses should be immediately attended to. During the night any damage to the wire entanglements must be repaired. Drainage comes next in order of importance, and this involves the digging of sumps and deepening of the drainage bottom. These are the repairs, but improvements must continually be made in the dugouts and communication trenches.