Читать книгу Our Navy at war онлайн

20 страница из 115

Usually, after vessels are authorized, months are required to prepare the plans and specifications. That was not the case this time. The Bureau of Construction and Repair, under the direction of Rear Admiral David W. Taylor, regarded in this country and abroad as one of the world's ablest naval constructors, had begun work on the plans long before. They were ready when the bill passed Congress. Bids were advertised for the next day, and as soon as the law allowed, contracts were let. Before the end of 1916, we had entered upon the biggest shipbuilding program ever undertaken by any navy at one time.

Providing for an enlisted strength of 74,700 regulars, Congress also authorized the President to increase the Navy to 87,000 in case of emergency. This, with the 6,000 apprentice seamen, the Hospital Corps, and allowance for the sick, prisoners and men on probation, would give us an emergency strength of some 95,000—including both officers and men, a force of over 100,000. Five thousand additional enlisted men and 255 more officers were authorized for the Marine Corps, which could be raised in emergency to 17,500. The increases alone were larger than the entire number of men employed by the Navy in the Spanish War. The Naval Reserve, instituted in 1915, was made a Naval Reserve Force unlimited in numbers.

Правообладателям