Читать книгу Robert Fulton and the Submarine онлайн

32 страница из 48

Unlike Bushnell, who under similar circumstances went home discouraged and hid himself under an assumed name, Fulton prepared to renew the attack. Waiting until another Minister of Marine had been appointed, he submitted new proposals, under date of 5 Thermidor an VI (23 July 1798), concluding the offer by pointing out that the destruction of the English navy would assure the freedom of the seas and the nation which had the most natural resources—France—would alone hold, and without rival, the balance of power in Europe. The Minister convened a board of technical men to whom Fulton submitted his plans for a submarine that he called the “Nautilus.” This boat had the shape of an imperfect ellipsoid, with an over-all length of 6 m. 48 (21 ft. 3 in.) and extreme beam 1 m. 94 (6 ft. 4 in.). Beneath the ellipsoid there was a hollow iron keel 0 m. 52 (1 ft. 8 in.) in height, running to within 1 m. from the bow. The keel contained a quantity of ballast so that the difference between the weight of the flotation and that of the water displaced by it should be only about 4 to 5 kilograms. The only communication with the interior of the keel lay in the two parts of a suction and force pump which by means of a hand crank would permit the introduction into or removal of water from the metal keel at will. The excess in buoyancy of the Nautilus being small, the introduction of only a little water would make it sink, and conversely, the expulsion of a small quantity would cause it to return to the surface. On the forward and top part of the Nautilus there was a spherical dome pierced with port holes covered by thick glass for observation and a man-hole that served as means of ingress and egress for the crew.

Правообладателям