Читать книгу The Tank Corps онлайн

94 страница из 102

The Mechanical Warfare Supply Department was now responsible for Tank production, and they had the task of arranging for the building of the 1000 Tanks which had been sanctioned on September 29.

In November the M.W.S. Department made an unofficial forecast of the probable rate of production. This forecast they confirmed officially on February 1.

The total output of Tanks was to be roughly as follows:

1917 January 50 February 50 March 120 April 120 May 140 June 200 July 240 August 260 September 280

Of these, after March at least eighty per month were to be of the Mark IV. type, of which, with the Mark IV.a, there was to be a total of over 1000.

In August or September, a proportion of the output was to be of the greatly improved Mark V. type. Actually at the end of March only sixty Tanks could be scraped together for the Battle of Arras, and most of these were machines that had been repaired after the Somme.

Not a single Mark IV. machine arrived in France until April 22, after the Battle of Arras had been fought and won, and no Mark V. machines until March 23, 1918. The entire programme was, in short, many months late.

Правообладателям